Monday, June 14, 2010

The 3/16" stainless hard line arrived today and I bent up a new right front line with the stuff. I have the factory part duplicated but plan to take the line back to the firewall and up to the proportioning valve where the factory line stops at the distribution block on the frame. Now I just need my flaring tool.

No comments:

Post a Comment